
BIM-EPIC and HSC Tape Pools STK ACL Support
5-72 BIM-EPIC Installation and System Guide
BIM-EPIC and HSC Tape Pools
BIM-EPIC uses single-character tape pool names (A-Z and 0-9). HSC allows longer pool
names which are not recognized by BIM-EPIC. For this reason, each HSC tape pool that is to
be used by BIM-EPIC must be defined to HSC as a pool using the following format:
EPICTAPEPOL-
x
where “EPICTAPEPOL-" is a constant. x is the one–character name of the corresponding
BIM-EPIC tape pool.
BIM-EPIC
Tape Pool
HSC Pool
JEPICTAPEPOL-J
REPICTAPEPOL-R
STK HSC does not provide notification of ACL cartridge insertion and ejection. This means
that the BIM-EPIC and HSC scratch cartridge inventories are not always synchronized.
To synchronize them, execute the SCRATCH, DSPLY SCRATCH, or TSCRATCH function
of the TSIDUTL program. See 6-7 in this manual for further information. The SYNCSTK
control must also be present. It is recommended that one of these functions be run at least
once a day, or after cartridges have been inserted into the ACL. DSPLY SCRATCH does not
enqueue the DSN Catalog, and can be run at any time without affecting other processing.
SCRATCH and TSCRATCH enqueue the BIM-EPIC Catalog during the scratch process, but
not during the synchronization process.
Introduction
Examples
Synchronizing BIM-
EPIC and HSC
Scratch Pool
Inventories
Komentarze do niniejszej Instrukcji