Memorex LOCK - VERSION 2-24 Dokumentacja Strona 257

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 489
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 256
Sorting with BIM-EPIC Introduction
Chapter 7. Running Jobs With BIM-EPIC 7-37
Sorting with BIM-EPIC
Introduction
This section describes the considerations necessary to use BIM-EPIC controlled datasets with
all sort programs in general and these three sort programs specifically:
SYNCSORT using BIM-EPIC Interface
IBM SORT beginning with DFSORT 3.3
CA-SORT
All sort programs check the assignment of a particular logical unit (SYSnnn) number before
actually opening a particular file (known as pre-open checking) and use PIOCS (Physical
Input Output Control Systems) to open, close, read, and write their datasets. Therefore, some
special considerations may be necessary when accessing BIM-EPIC controlled datasets with
your sort program. These considerations fall into three categories:
Satisfaction of pre-open checking
Acquisition of necessary DTF information
Deletion of the SORTWK dataset(s)
Pre-open checking can be satisfied using JCL considerations. BIM-EPIC automatically
deletes controlled SORTWK datasets at EOJ. DTF information not supplied by the sort
program either is lost or must be acquired by other means.
Description
Przeglądanie stron 256
1 2 ... 252 253 254 255 256 257 258 259 260 261 262 ... 488 489

Komentarze do niniejszej Instrukcji

Brak uwag